Check and re-check the plans against the building!
The building is progressing for barn 2 but not without the odd hiccup. Due to a misunderstanding with the versions of the plans some of the joists were ordered incorrectly. This meant that more had to be ordered causing a week's delay to the first floor boarding out and consequently the continuation of the block and brick laying on the first floor. It's such a shame because the weather has been so good for building. We took the opportunity in the lull in building activity to have a good scout around in barn 1 by manoeuvring a ladder into place so that we could get into the first floor bedroom. We haven't been up there since before the rafters and boarding were fitted and barn 1 only has one first floor bedroom and en-suite, so is a small part of the building as a whole. We then discovered that one of the roof windows was in the wrong place. Again a later change to the plans hadn't been included so when the staircase was changed to bend around at the top of the stairs rather than just go straight up, it meant that the bathroom became a bit larger. Now the bathroom has an extra roof window and the stairs none! Fortunately, this is not a disaster because neither the roof or the windows have been fitted. Phew......we are so glad we checked now rather than later.
The window lintels are looking great in plot 2 with a mixture of brick arches and original stone lintels.